RACI Matrix

Sometimes responsibilities aren’t clear. By creating a RACI (Responsible, Accountable, Consulted, Informed) matrix, a group will tackle the responsibility problem directly.

Duration: 60m - 90m
Participants: 2 - 6
Difficulty:  Medium

Goal

To have clear responsibilities for a project

Materials

    Instructions

    Preparation

    To set up the matrix, you will need two lists:

    • A work breakdown: These are the items or activities that the group shares responsibility for creating or managing. These should be specific enough to answer when a team member asks, “Who does X?”
    • A list of roles: Instead of creating a list of individuals, create a list of roles that represent a group of related tasks. For example, “Project Manager”, “Business Analyst”, and “Architect” are better than “Tim”, “Bob”, and “Mary” because individuals can play multiple roles on a project, and multiple people can contribute to a single role.

    Flow

    Create the matrix by listing the work breakdown along the vertical axis and the roles along the horizontal axis. Inside the matrix, the group will work through assigning levels of responsibility by coding R, A, C, I:

    • Responsible: This is the doer of the work. Although this person may delegate or seek support from others, ultimately this one person is responsible for doing the work.
    • Accountable: This person is accountable for the work that the Responsible person does, and signs off on the work. The golden rule of RACI is that only one person can be Accountable for each task.
    • Consulted: These contributors provide input, opinions, and advice through two-way communication.
    • Informed: Although they are not contributors, these people are kept up-to-date on progress or completion through one-way communication.

    In working through the matrix with the group, it is best to follow the natural progression of the work breakdown from start to finish. The matrix is complete when every task has a clear set of responsibilities.


    Note: Where it is difficult to assign a single Responsible role, it may help to split the item into two smaller, better-defined pieces. Other items will have no Responsible role at all, and the group may decide to eliminate them.

    Attachments

    • Raci matrix cover.PNG

    Background

    RACI Matrix is based on the same-named diagram traditionally employed in the management of cross-functional teams.

    Source: Gamestorming

    Author

    Gamestorming is a set of co-creation tools used by innovators around the world. Think back to the last time you played a game. What was the game? Why did you choose to play? Was it a simple game like tic-tac-toe, or something more complex, like Monopoly, Scrabble or Chess? Or maybe it was a game of basketball? Did you play with friends? With family? Try to recapture the feeling you had as you played the game. How did it feel? Would you like to have more of that feeling at work? Games come naturally to human beings. Playing a game is a way of exploring the world, a form of structured play, a natural learning activity that’s deeply tied to growth. Games can be fun and entertaining, but games can have practical benefits too. These games are designed to help you get more innovative, creative results in your work. We’ll show you not only how to play them but how to design them so they fit your own specific work goals.
    More about author

    2 Ratings 

    This method has been rated 2 time(s), with an average rating of 5.0.

    1 Comments

  • Thanks for this, will use it with a a group of Health Professionals this week. I'll provide an update after this
    over 3 years ago
  • Please Log in or Sign up for a FREE SessionLab account to continue.